Partners:     get your own website     learn XML

SAP Blog Aggregator      Forums Online Training CBT's SAP Articles SAP Jobs SAP Resumes
Books Links   Vendor Directory   Search   Submit Content

Forum main page

Login
Register
Log out

View our event calendar
Add general event such as an upcoming software release or conference
View all birthdays

Public image gallery
Upload your images in your profile

Search page

Profile editing page
Subscription list page
Address book page

Member list page
View the most active member
User groups listing

Private message page

Changed delivery does not trigger re-transmission of TPSDLS01 Idoc to external TPS

 
Logged in as: Guest
Users viewing this topic: none
  Printable Version
All Forums >> [SAP Technical] >> Interfaces >> Changed delivery does not trigger re-transmission of TPSDLS01 Idoc to external TPS Page: [1]
Login
Message << Older Topic   Newer Topic >>
Changed delivery does not trigger re-transmission of TP... - 26 January 2008   
onmywings

 

Posts: 1
Joined: 26 January 2008
Status: offline
We have a R/3 Release 4.6C server, which is configured to send delivery IDoc (TPSDLS01) to external transportatoin planning system (TPS) via ALE/RFC.

When a new delivery is created, we can invoke VT61 to transmit TPSDLS01 to notify TPS. When a delivery is deleted or deallocated, R/3 immediately transmits the TPSDLS01 IDoc to notify TPS. These all work just fine, but we have a problem:

When a delivery that has already been transmitted to TPS but got modified after the first transmission, we need to be able to transmit it again to notify TPS of such change. However, R/3 refuses to transmit it again. When invoking VT61, nothing get transmitted and the log would say the delivery <delivery id> already transmitted to planning system <TPS ID>.

I am new to this, but it seems to be a simple configuration issue. I am suspecting the problem may come from the output parameters of our partner profiles. On the "Message Control" page for outbound message type TPSDLS, we have nothing defined.

On page 8 of the R/3 Transportation Planning Interface Document (https://www.sdn.sap.com/irj/servlet/prt/portal/prtroot/docs/library/uuid/9519a090-0201-0010-189d-a9d947b30a8e), there is a paragraph:

quote:

Deliveries that are changed in R/3 (transaction VL02) after they have already been reported to the transportation planning system are automatically retransferred after the changes are posted (provided they are relevant to transportation). This functionality is activated by the link to message control. When a change is made, the whole document is retransferred (not only the changed data is transferred).


Could anyone explain what this "activated by the link to message control" means (in terms of steps and exact field values)? Or if you think the problem is from elsewhere, please let me know.

Many thanks.
Post #: 1
Page:   [1]
All Forums >> [SAP Technical] >> Interfaces >> Changed delivery does not trigger re-transmission of TPSDLS01 Idoc to external TPS Page: [1]
Jump to:





New Messages No New Messages
Hot Topic w/ New Messages Hot Topic w/o New Messages
Locked w/ New Messages Locked w/o New Messages
 Post New Thread
 Reply to Message
 Post New Poll
 Submit Vote
 Delete My Own Post
 Delete My Own Thread
 Rate Posts



About Us   Contact Us   Privacy   Disclaimer   Feedback   Email Discussion   Newsletter

Copyright © - Independent SAP Information
Designed, Hosted and Maintained by Hosting-SA

Forum Software © ASPPlayground.NET Advanced Edition 2.4.3 Unicode

0.078